What this site is本網站是什麼
A model of Taiwan's electricity system built with PyPSA-Earth, an open-source energy system model. It takes Taiwan's power plants (from Taipower's own unit list), the transmission grid (from OpenStreetMap), hourly weather (ERA5) and demand, and finds the lowest-cost way to run the system for every 4-hour step of a year. The results, the inputs and every data source are published here. 以開源能源系統模型 PyPSA-Earth 建置的台灣電力系統模型。模型使用台灣的電廠(取自台電機組清單)、輸電網路(取自 OpenStreetMap)、逐時氣象(ERA5)與需求,計算一整年中每 4 小時最低成本的系統運轉方式。結果、輸入資料與所有資料來源都公開在本網站。
What it can and cannot tell you能與不能回答的問題
- Good for: comparing options, e.g. whether more offshore wind or a nuclear restart cuts more CO₂, or where the grid limits supply.適合:比較方案,例如增加離岸風電或重啟核電哪個減碳較多,或電網在哪裡限制供電。
- Not a forecast: 6 regions instead of the real grid, 4-hour time steps, a few weather years, and costs from international projections in euros.不是預測:以 6 個區域代表實際電網、每 4 小時一個時段、少數幾個氣象年,成本採國際預估值(歐元)。
- Not official: this is independent research, not a product of Taipower or any government agency. Official figures are quoted with their sources.非官方:這是獨立研究,並非台電或任何政府機關的產品。引用的官方數據皆註明來源。
Data and code資料與程式碼
All code is on GitHub. Official data comes from Taiwan's open-data platform (Government Open Data License v1); every source, with its page and file checksum, is listed on the Taiwan energy data page. Map data © OpenStreetMap contributors (ODbL); weather data from ERA5 (Copernicus Climate Change Service). 所有程式碼都在 GitHub。官方資料取自政府資料開放平臺(政府資料開放授權條款第 1 版);每個來源及其頁碼與檔案檢查碼列於台灣能源資料頁。地圖資料 © OpenStreetMap 貢獻者(ODbL);氣象資料來自 ERA5(哥白尼氣候變遷服務)。
Contact聯絡
For a new scenario, use the request form. For anything else, email barton.chen.energy@gmail.com.申請新情境請使用申請表單;其他事項請寄信至 barton.chen.energy@gmail.com。